Aerial view of Toronto's condo towers and the CN Tower at sunset.

AI-generated illustrative footage

Concept demo — fictional company

Greater Toronto Area · Multi-residential

Window replacementfor occupied buildings.One suite at a time.

For property managers and condo boards: full tear-out to the masonry, installed from the exterior on swing stages — and residents back home the same evening.

Same-day suite completion · Year-round work · Works to your engineer's spec

For property managers & boards

Built around a schedule agreed with your management.

01

Your consultant's specification

We work to the spec written by your engineer or building-envelope consultant — not around it. Resident questions go through property management.

02

Resident notice, ready to send

A resident notice and prep checklist prepared for management to send one to two months ahead of each suite's date.

03

Finished the same day

Each suite is opened, installed, sealed and cleaned within one working day.

04

Year-round work

We work through the seasons. Only high wind or bad weather pauses swing-stage work — and those days are rescheduled, not skipped.

Process

Seven steps, from first request to final walk-through.

  1. 1

    Intro request

    An intro call or a chat request about the building.

  2. 2

    Site visit & building assessment

    A site visit to assess the building and its windows.

  3. 3

    Written proposal

    Priced and scoped to the building's drawings and, where available, your engineer's specification.

  4. 4

    Mock-up / sample unit

    A mock-up or sample unit for the board and consultant to review.

  5. 5

    Resident notice schedule

    A resident notice schedule, agreed with management — work moves by vertical stacks.

  6. 6

    Suite-by-suite installation

    One suite per working day, from the exterior on swing stages.

  7. 7

    Deficiency walk-through & warranty

    A deficiency walk-through; warranty terms as set in the contract.

For residents

What installation day looks like.

Your building is getting new windows. Here's an honest picture of the day your suite is done.

  1. HoursTypically 8:00–17:00, crews often finish earlier.

Before we arrive

  • →Move furniture away from windows and the balcony door.
  • →Cover your belongings — it gets dusty.

You don't need to

  • ×Take down blinds — we do it.
  • ×Be home — management provides access.

“It's loud — old frames are cut out and anchors drilled into concrete.”

  • — Units with pest issues are rescheduled until treatment is done.
  • — Bad-weather days are rescheduled by your property manager.

What we install

Aluminum frames. Double-glazed sealed units.

Other glazing options are discussed during the building assessment, with your consultant.

Frame
Aluminum
Glazing
Double-glazed sealed units
Scope
Windows, balcony doors
Options
Discussed at assessment

Building assessment

Request a building assessment.

Tell us about the building. We'll reply to arrange a site visit.

Demo — please don't enter real personal data.